Trenchless construction is the use of construction methods to install and repair underground utility systems with minimum open cut excavation. This includes the use of pipe jacking, micro tunneling, horizontal direction drilling, and guided boring systems. This was adopted to replace the aging utility infrastructure and install new facilities, while minimizing disruptions to traffic communities and business, reducing environmental impact and lowering the high costs of pavement removal and site restoration. Critical areas of a trenchless application include crossing of conduits beneath highways, streets, railroads and other transportation arteries. Chapter one: Introduction which gives the general background of the study, statement of the problem, significance of the project, project objectives and scope of the project Chapter two: Literature review, which reviews documents, related to the study topic. Chapter three: Methodology which contains the primary and secondary data, quantitative and qualitative evaluations of trenchless method to the obtain best applicable Trenchless method to use for installation of the designed concrete duct and procedures how to install the duct. Chapter four: results, discussions and findings obtained in the test results and traffic count. Chapter five: challenges, the conclusions and recommendations.

DESIGN OF AN UNDERGROUND UTILITY DUCT USING TRENCHES METHOD (CASE STUDY: KIMERA ROAD) TRENCHLESS METHOD
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0168
  • Access Fee: ₦5,000 ($14)
  • Pages: 52 Pages
  • Format: Microsoft Word
  • Views: 476
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Civil Engineering
    Project ID CVE0168
    Fee ₦5,000 ($14)
    No of Pages 52 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT Trenchless construction is the use of construction methods to install and repair underground utility systems with minimum open cut excavation. This includes the use of pipe jacking, micro tunneling, horizontal direction drilling, and guided boring systems. This was adopted to replace the aging utility infrastructure and install new... Continue Reading
    ABSTRACT This study was conducted to identify the Effects of Demonstration and Guided Discovery methods on the student’s academic performance in Biology. The sample consisted of 120 SSIII Biology students selected from four senior secondary schools in Alimosho Local Government Area of Lagos State based on random sampling techniques. A quasi... Continue Reading
    ABSTRACT This study was conducted to identify the Effects of Demonstration and Guided Discovery methods on the student’s academic performance in Biology. The sample consisted of 120 SSIII Biology students selected from four senior secondary schools in Alimosho Local Government Area of Lagos State based on random sampling techniques. A quasi... Continue Reading
    ABSTRACT The production of cassava flour by the method of traditional processing method (sun drying) and modern processing method (oven drying) was carried out using cassava sliced cubes or peeled cassava. Indeed, the traditional Nigeria techniques of... Continue Reading
    ABSTRACT The production of cassava flour by the method of traditional processing method (sun drying) and modern processing method (oven drying) was carried out using cassava sliced cubes or peeled cassava. Indeed, the traditional Nigeria techniques of... Continue Reading
    ABSTRACT The production of cassava flour by the method of traditional processing method (sun drying) and modern processing method (oven drying) was carried out using cassava sliced cubes or peeled cassava. Indeed, the traditional Nigeria techniques of cassava flour production was studied with a view of achieving same product mechanically. Result... Continue Reading
                                                      ABSTRACT     This study was designed to investigate out how solid waste is managed in Ibadan North East local government area of Oyo State.  One duly validated instrument- Questionnaire on Waste Generation and Disposal (QWGD) (r= 0.75) ans... Continue Reading
                                                      ABSTRACT     This study was designed to investigate out how solid waste is managed in Ibadan North East local government area of Oyo State.  One duly validated instrument- Questionnaire on Waste Generation and Disposal (QWGD) (r= 0.75) ans... Continue Reading
    ABSTRACT The design of a 1000 tonnes per annum Shea butter plant was carried out using data obtained from literature. Assumptions were made, where experimental data were not available. The block diagram, process flow sheet, material and energy balance on the process was carried out and presented on this work. A total of six units were used in the... Continue Reading
    It's a journal that explains the design of a shea butter plant.... Continue Reading
    Call Us
    whatsappWhatsApp Us