THE WATER DRAINAGE PROBLEMS (A CASE STUDY OF IMT CAMPUS 3 ENUGU)

  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0265
  • Access Fee: ₦5,000 ($14)
  • Pages: 39 Pages
  • Format: Microsoft Word
  • Views: 548
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT

This research work on the water drainage problems (A case study of IMT campus 3 Enugu), the scope of this research work covers every activity which has to do with the drainage problems, background to the subject matter, rational for the study and the limitations of the study, the research review as, the related literature about the authors and scholars, facts and opinions. The findings of this study through the further research.
Finally, base on the findings, a numbers of recommendations were made so that campus 3 IMT Enugu should ensure a good water drainage system within the campus to permit a perfect seepage, discharging, flooding of water and effluent.

TABLE OF CONTENTS
Title page
Approval page
Dedication
Acknowledge
Abstract
Table of content
List of table

CHAPTER ONE
1.0 Introduction
1.1 Importance of drainage
1.2 Objectives of study

CHAPTER TWO
2.0 Literature review
2.1 Types of drainage
2.2 Rational formula
2.3 Hydrological circle
2.4 Forms of waste water
2.5 Sources of water

CHAPTER THREE
3.0 Location of IMT campus 3 Enugu
3.1 Sources of waste water in campus3
3.2 Existing drainage systems
3.3 Best hydraulic design

CHAPTER FOUR
4.0 Discussion
4.1 Problems of water drainage and environmental impacts
4.2 Solution to the problems
4.3 Designing and constructional solution

CHAPTER FIVE
5.0 Recommendations
5.1 Conclusion
5.2 Bibliography
    Reference

THE WATER DRAINAGE PROBLEMS (A CASE STUDY OF IMT CAMPUS 3 ENUGU)
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0265
  • Access Fee: ₦5,000 ($14)
  • Pages: 39 Pages
  • Format: Microsoft Word
  • Views: 548
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Civil Engineering
    Project ID CVE0265
    Fee ₦5,000 ($14)
    No of Pages 39 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT This research work on the water drainage problems (A case study of IMT campus 3 Enugu), the scope of this research work covers every activity which has to do with the drainage problems, background to the subject matter, rational for the study and the limitations of the study, the research review as, the related literature about the... Continue Reading
    ABSTRACT This research work on the water drainage problems (A case study of IMT campus 3 Enugu), the scope of this research work covers every activity which has to do with the drainage problems, background to the subject matter, rational for the study and the limitations of the... Continue Reading
    ABSTRACT This research work on the water drainage problems (A case study of IMT campus 3 Enugu), the scope of this research work covers every activity which has to do with the drainage problems, background to the subject matter, rational for the study and the limitations of the study, the research review as, the related literature about the... Continue Reading
    ABSTRACT This research work on the water drainage problems (A case study of IMT campus 3 Enugu), the scope of this research work covers every activity which has to do with the drainage problems, background to the subject matter, rational for the study and the limitations of the study, the research review as, the related literature about the... Continue Reading
    ABSTRACT             Samples of water from the different hostels in campus II and other source of water production namely Ajali-owa water, from bore hole 9th mile and spring water from GRA water board were water collecterd and analysed using total plate count and multiple tube fermentaton techniques coliform.  The results shows no... Continue Reading
    ABSTRACT Samples of water from the different hostels in campus II and other source of water production namely Ajali-owa water, from bore hole 9th mile and spring water from GRA water board were water collecterd and analysed using total plate count and multiple tube fermentaton techniques coliform.  The results shows no coliforms in production... Continue Reading
    ABSTRACT Samples of water from the different hostels in campus II and other source of water production namely Ajali-owa water, from bore hole 9th mile and spring water from GRA water board were water collecterd and analysed using total plate count and multiple tube fermentaton techniques coliform. The results shows no coliforms in production water... Continue Reading
    ABSTRACT             Samples of water from the different hostels in campus II and other source of water production namely Ajali-owa water, from bore hole 9th mile and spring water from GRA water board were water... Continue Reading
    ABSTRACT Samples of water from the different hostels in campus II and other source of water production namely Ajali-owa water, from bore hole 9th mile and spring water from GRA water board were water collecterd and analysed using... Continue Reading
    ABSTRACT This research work is aimed at finding the courses of the organization and management problems of rural water supply programme in Nigeria, with a case study of Enugu State Water Corporation Enugu. To guide this study thirteen (13) research questions were formulated and tested with percentages. Based on the findings, some major findings... Continue Reading
    Call Us
    whatsappWhatsApp Us