DESIGN AND SIMULATION OF TRAFFIC CONTROL SYSTEM FOR A T-JUNCTION

  • Type: Project
  • Department: Computer Science
  • Project ID: CPU0050
  • Access Fee: ₦5,000 ($14)
  • Chapters: 1-7 Chapters
  • Pages: 56 Pages
  • Methodology: NIL
  • Reference: YES
  • Format: Microsoft Word
  • Views: 3.4K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
DESIGN AND SIMULATION OF TRAFFIC CONTROL SYSTEM FOR A T-JUNCTION
ORGANIZATION OF WORK

            This project has seven chapters. Each chapter deals with the chapter one. This chapter introduces the statement of the problem purpose of this study. The aims and objectives of the program. The scope, limitations and constraints, assumptions of program, and the definition of terms.
Chapter two    -           This chapter
Chapter three  -           Deals with the description and analysis of the existing system with regards to the fact finding methods, organizational structure, objectives of the existing system, the input, process and output analysis, the information flow diagram, problems of the existing system and finally justification of a new system.
Chapter four - Deals with the design of the new system taking into consideration of the output specification and design. Input specification and design file design, procedure chart, system flow chart and the system requirement.
Chapter five    -Talks of the implementation, program design, program flowchart,  pseudocodes. Source program and test run.
Chapter six      -           Deal with the documentation of the program.
Chapter seven -           this final chapter deals with the conclusion and recommendation and the bibliography.
 TABLE OF CONTENTS
 CHAPTER ONE
1.0       Introduction
1.1       Statement of problem
1.2       Purpose of the study
1.3       Aims and objectives
1.4       Scope or Delimitations
1.5       Limitations and constraints
1.6       Assumptions
1.7       Definition of terms
CHAPTER TWO
2.0              Review of related literature
 CHAPTER THREE
Description and analysis of the existing system
3.1       Fact finding methods
3.2              Organizational structure
3.3       Objectives of the existing system
3.3              Input, process, output analysis
3.4              Input, process, output analysis
3.5              Information flow diagram
3.6       Problems of the existing system
3.6              Justification of the new system
 CHAPTER FOUR
Design of the new system
4.1              Output specification and design
4.2       Input specification and design
4.3       File design
4.4              Procedure chart
4.5              System flowchart
4.6              System requirement
 CHAPTER FIVE
Implementation
5.1              Program design
5.2       Source program
5.3       Program flowchart
5.4              Pseudocades
5.5              Test run
 CHAPTER SIX          
Documentation
6.1              System documentation
6.2              Program documentation
6.3              User documentation
CHAPTER SEVEN
Conclusion and Recommendation
7.1              Conclusion
7.2              Recommendation
Bibliography
 CHAPTER ONE
 INTRODUCTION
            Computer technology is one of the achievements made by man. Its benefit has seen man being able to solve some of his immediate problems. It has opened the door to a large number of important applications that were not economically feasible in the past. Its applications ranges from automating devices in most offices where most tasks are highly automated to on-line computer control of industrial and commercial process for which this project is concerned.
            The computer therefore presents a great opportunity to develop system more economically not simply because the availability of methodology and theories that could not previously be economically justified, among these numerous applications of the computer is it’s use in controlling and monitoring traffic, this is reality a very expensive application because it has several features to utilize in the design.
            The main reason for embarking on this project is because it is noteworthy that traffic system in ESUT-IMT Road Junction is very poor which results in traffic jams and most of which cause automobile accident within this junction due to congestion among road users with the increasing population and consequent increase in economic activities. However it is noteworthy to note that urban traffic jams are not limited to developing countries alone, but other developed countries still experience the same problem given the nature of their road network.
            The reason as stated above for the problems being encountered for non-application of computer in the monitoring and controlling of the junction is enough to automate the traffic control system using it as the best alternative to direct the flow of traffic effectively and efficiently.
 1.1       STATEMENT OF THE PROBLEM
            The reason for embarking on this particular project is due to the fact that traffic jam is a problem within this T-junction because it has caused most of the automobile accidents and mishaps. This problem could also be attributed to the mistakes made by traffic policemen who might suddenly stop a line in order to give preference to some class of individuals and therefore pass wrong line or road. Since there is also on increasing population made up of students of the two higher institutions as well as the economic activities, road users experience what can be called ‘a diary ordeal’ as most of their time is spent on the road as a result of congestion cause holdups. This situation affects mainly ESUT and IMT students and lecturers, as they are the major users of this T-junction.
 1.2       PURPOSE OF THE STUDY
            I decided to embark on this project owing to the need and importance of an automated control system to stop the above-mentioned problems and which also can help to avert avoidable road mishaps in this kind of junction.
 1.3       AIMS AND OBJECTIVES
            The objectives of this project design are to identify, examine, daily signals, monitor problems associated with traffic control on the aforementioned junction. This will also withstand high temperature, wind blow and rainfall, which affect the manual system that does the task. The design assumes the computer screen as the point of traffic light installation where light will be allowed to cycle over a fixed interval of time between the East, West and South of the T-junction road, it will also control the pedestrian request button such that if it is pressed the current cycle will terminate naturally with the use of the programming language, the design will direct the flow of traffic showing how and when the vehicles will be passed or in other words to achieve the above mentioned tasks with the display on screen.
 1.4       THE SCOPE
            This project analysis the existing traffic control system, comparing both the manual and electronic method of controlling traffic. It helps to determine the design, which can handle some of the problems of the earlier system.
            Manually, traffic control system involves human beings whose steadiness cannot be assured. Factors such as environment, state of mind and human relation militate against adopting human traffic control system.
            Electronically, it is better although this system can easily breakdown if not properly maintained. On the other hand, the automated system is the best to implement as it gives room for flexibility and efficiency of the system.
 
DESIGN AND SIMULATION OF TRAFFIC CONTROL SYSTEM FOR A T-JUNCTION
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Computer Science
  • Project ID: CPU0050
  • Access Fee: ₦5,000 ($14)
  • Chapters: 1-7 Chapters
  • Pages: 56 Pages
  • Methodology: NIL
  • Reference: YES
  • Format: Microsoft Word
  • Views: 3.4K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Computer Science
    Project ID CPU0050
    Fee ₦5,000 ($14)
    Chapters 1-7 Chapters
    No of Pages 56 Pages
    Methodology NIL
    Reference YES
    Format Microsoft Word

    Related Works

    ABSTRACT The aim of this design work is to allow traffic light to rotate over a designated time interval between the two roads concerned i.e IMT and ESUT Junction. This design will control and monitor devices and cars within its environment i.e the junction.  It will as well steer small vehicles showing them how to obey the traffic instructions... Continue Reading
    ABSTRACT The aim of this design work is to allow traffic light to rotate over a designated time interval between the two roads concerned i.e IMT and ESUT Junction. This design will control and monitor devices and cars within its environment i.e the junction. It will as well steer small vehicles showing them how to obey the traffic instructions... Continue Reading
    ORGANIZATION OF WORK This project has seven chapters. Each chapter deals with the chapter one. This chapter introduces the statement of the problem purpose of this study. The aims and objectives of the program. The scope, limitations and constraints, assumptions of program, and the... Continue Reading
    ABSTRACT This project work is an attempt to control the speedof the vehicle designed with computer software to enable thethird party or owner to get the location, speed and activity of thedriver. To achieve this, the system can transmit the informationin real time. The use of GSM/GPRS technologies allows thesystem to track the objects and provide... Continue Reading
    ABSTRACT This project work is an attempt to control the speedof the vehicle designed with computer software to enable thethird party or owner to get the location, speed and activity of thedriver. To achieve this, the system can transmit the informationin real time. The use of GSM/GPRS technologies allows thesystem to track the objects and provide... Continue Reading
    ABSTRACT Temperature determines the survival of all natural creatures and as well the operational fitness of all scientific invention, it is quite important to every aspect of human endeavor and its control is as important as the temperature itself. This research work centers... Continue Reading
    ABSTRACT Temperature determines the survival of all natural creatures and as well the operational fitness of all scientific invention, it is quite important to every aspect of human endeavor and its control is as important as the temperature itself. This research work centers its study on temperature and its control with a view of designing and... Continue Reading
    ABSTRACT Temperature determines the survival of all natural creatures and as well the operational fitness of all scientific invention, it is quite important to every aspect of human endeavor and its control is as important as the temperature itself. This research work centers its study on temperature and its control with a view of designing and... Continue Reading
    ABSTRACT Temperature determines the survival of all natural creatures and as well the operational fitness of all scientific invention, it is quite important to every aspect of human endeavor and its control is as important as the temperature itself. This research work centers its study on temperature and its control with a view of designing and... Continue Reading
    ABSTRACT Temperature determines the survival of all natural creatures and as well the operational fitness of all scientific invention, it is quite important to every aspect of human endeavor and its control is as important as the temperature itself. This research work centers its study on temperature and its control with a view of designing and... Continue Reading
    Call Us
    whatsappWhatsApp Us