DESIGN OF AN ARTIFICIAL LIFT SYSTEM FOR OPTIMIZATION PRODUCTION FOR WELL J-50

  • Type: Project
  • Department: Computer Science
  • Project ID: CPU0431
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 55 Pages
  • Format: Microsoft Word
  • Views: 1.5K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

CHAPTER 1

INTRODUCTION

1.0 Background of Study

Oil and Gas is considered to be one of the major sources of energy in the world due to its high energy density, easy transportability, and relative abundance. It is a vital factor in every country’s economy. Almost all items that we buy, use, and consume are products of oil. The EIA (Energy Information Administration) stated that the world consumption of crude oil daily is 85.64 million barrels, which is equivalent to 2 liters of oil per day per person.

Generally, oil can be produced from the reservoir by the stored energy of the oil in the reservoir. This energy is obtained by the difference between the reservoir and wellbore pressures. If this difference is high, the well will be capable of producing naturally. Most oil wells worldwide produce naturally in their early lives until there is a decrease in the reservoir pressure which leads us to enhanced oil recovery.

When a well has been producing for a period of time, there will be decrease in reservoir pressure and as a result the difference between reservoir and wellbore pressure will decline. So, the energy in the well will not be able to lift oil up to surface, or it might lift oil to the surface but in less than economic volume. At this stage, artificial lift is introduced and it can be utilized to overcome this issue by reducing the wellbore pressure. This reduction will bring back the essential difference between the reservoir and wellbore pressure so oil can be extracted and lifted up to the surface.

One of the most important roles of artificial lift is to maximize the production rate from flowing wells. Artificial lift can be divided into two types, based on lifting mechanism: gas lifting and pumps.  The gas lifting method makes use of a compressed gas that is injected from the surface to certain points in the tubing. This gas will lower the density of the fluid column in the tubing causing a reduction in the wellbore pressure and therefore increasing production. The pumping method, on the other hand, involves setting the pump at a certain depth inside the tubing that will cause it to be submerged below the liquid level. This pump will lower the wellbore pressure and hence increase the drawdown, thereby boosting production. The most common artificial lift methods used are as follows:

  • Electrical Submersible Pump (ESP)
  • Sucker Rod Pumps (SRP)
  • GasLift (GL)
  • Plunger Lift Pumps (PLNG)
  • Progressive Cavity Pumps (PCP)
  • Hydraulic Pumps (HP)

Bearden (2007), stated that ESP is the most competent and consistent method of artificial lift when moderate to high volume of oil needs to be lifted from the well. He also estimated the lifting capacity of ESPs to be as low as 150 barrels per day and as high as 150,000 barrels per day. Fig 1.1 below shows the various types of artificial lifts and their utilization worldwide.

Fig 1.1 Artificial lift types and their utilization.

  1. Statement of Problem

A major challenge faced in lifting oil and gas from the reservoir through the production tubing to the surface facilities is an unnecessary production decline which is as a result of low reservoir pressure and it is a serious problem in the petroleum industry today. This decline may be as a result of mismanagement of wells, excessive pressure drops along the production system, oversized or undersized tubing, and improper perforation method etc. A change in any component of the production system may lead to a change in the pressure drop behavior of the other components since the various components are interactive.

This study shows the design of an ESP artificial lift system and production optimization of Well J-50 is a new horizontal well in a Niger Delta field. In other to optimize production and produce about 10,000bopd as the desired rate of production, ESP was recommended to be designed for the well to achieve optimum production by.

  1. Methodology

The method to be used for this work is the analytical method of ESP design and using the software PROSPER. In the analytical method the following steps will be taken to design the ESP design;

  • Collection of basic data
  • Calculation of production capacity
  • Gas calculations
  • Determination of Total Dynamic Head (TDH)
  • Pump-type selection and calculation of pump stages
  • Optimum size of components
  • Electric cable selection

In using PROSPER (Production System Performance Analysis Software) to design the ESP system the following steps will be followed;

  • Using existing PVT and VLP data has a basis of new analysis.
  • Calculating pump intake and outlet pressures.
  • Designing an ESP system
  • Evaluating pump operating point sensitivities.
  • Calculate a flowing gradient for an ESP equipped well.

1.3 Aim and Objectives

The major aim of carrying out this research is to optimize production for well J-50 by    designing an artificial lift system while its objectives are as follows;

  • To design an artificial lift system (ESP) for a well that the production rate has declined.
  • To boost production for a producing well and increase revenue.
  • To describe and design an operation of ESP for a given well.

1.4 Significance of study.

The significance of this study in the petroleum industry is to show the importance of designing ESP for a new well and also the use of artificial lift in maximizing oil production.

1.5 Scope and limitations of Research

The scope of this research is limited to the use of manual method and PROSPER in designing an ESP for artificial lift so as to optimize production. There are other softwares that can also be used in designing an ESP System but for this project PROSPER is used due to availability. The study is conducted in a Niger Delta reservoir and a suitable ESP design will be done to increase the well production potential.

DESIGN OF AN ARTIFICIAL LIFT SYSTEM FOR OPTIMIZATION PRODUCTION FOR WELL J-50
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Computer Science
  • Project ID: CPU0431
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 55 Pages
  • Format: Microsoft Word
  • Views: 1.5K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Computer Science
    Project ID CPU0431
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 55 Pages
    Format Microsoft Word

    Related Works

    CHAPTER 1 INTRODUCTION 1.0 Background of Study Oil and Gas is considered to be one of the major sources of energy in the world due to its high energy density, easy transportability, and relative abundance. It is a vital factor in every country’s economy. Almost all items that we buy, use, and consume are products of oil. The EIA (Energy... Continue Reading
    The reservoir characteristics of the gas condensate well is special and the changes of the behavior of the well have a significant impact to the production rate. When we do a proper optimization that can lower the operating costs, maximizing HC recovery and the net present value of a project can be increased. The optimization of the well level can... Continue Reading
    ABSTRACT Solution gas drive reservoirs are characterized by rapid and continuous decline of reservoir pressure. This rapid and continuous decline of reservoir pressure causes direct decline of reservoir performance at early stages of the life of the reservoir. The principal source of energy which is gas liberation from the crude oil and the... Continue Reading
    Introduction Hydrocarbons(oil and gas) are found in the pore spaces of sedimentary geologic formations (reservoir rocks).  Once an oil or gas reservoir is discovered and assessed, production engineers begin the task of maximizing the amount of oil or gas that can ultimately be recovered from it. Some reservoir rocks may allow the oil and gas to... Continue Reading
    Abstract Solution gas drive reservoirs are characterized by rapid and continuous decline of reservoir pressure. This rapid and continuous decline of reservoir pressure causes direct decline of reservoir performance at early stages of the life of the reservoir. The principal source of energy which is gas liberation from the crude oil and the... Continue Reading
    ABSTRACT Theaim of this study is to investigate why the implementation of Unity and Efficiency in Production(UEP)is not yielding the expected results in PAN. The overall operations, production and sales are still on the low trend.This survey examined how the adaptation of UEP tools and the level of functions integration relate to the overall... Continue Reading
    ABSTRACT Optimization is the process of transforming a piece of code to make more efficient(either in terms of time or space) without changing its output or side-effects. The onlydifference visible to the code’s user should be that it runs faster and/or consumes lessmemory. It is really a misnomer that the name implies you are finding an... Continue Reading
    ABSTRACT Optimization is the process of transforming a piece of code to make more efficient (either in terms of time or space) without changing its output or side-effects. The only difference visible to the code’s user should be that it runs faster and/or consumes less memory. It is really a misnomer that the name implies you are finding an... Continue Reading
    ABSTRACT Hydrocarbon production in the petroleum industry is often constrained by reservoir heterogeneity, deliverability and capacity of surface facilities, also optimization technique in the petroleum industry requires execution of several iterative runs by comparing various solutions until an optimum or satisfactory solution is found. In this... Continue Reading
    ABSTRACT  Production of carbon black from novel sources like spent automobile tyre, anthracite coal, furnace soot and graphite rod and subsequent use in the production of offset printing inks has been investigated. Carbon black from these sources were obtained by pyrolysis of shredded spent tyre and coal samples at 750-900o C in an electrical... Continue Reading
    Call Us
    whatsappWhatsApp Us