OPTIMUM ARTIFICIAL LIFT SELECTION FOR CONDENSATE GAS WELL

  • Type: Project
  • Department: Petroleum Engineering
  • Project ID: PEE0046
  • Access Fee: ₦5,000 ($14)
  • Pages: 26 Pages
  • Format: Microsoft Word
  • Views: 382
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

The reservoir characteristics of the gas condensate well is special and the changes of the behavior of the well have a significant impact to the production rate. When we do a proper optimization that can lower the operating costs, maximizing HC recovery and the net present value of a project can be increased. The optimization of the well level can be accomplished by adjusting well parameters such as tubing size, wellhead and the skin factor. All of these parameters were investigated with the using of a PIPESIM simulation software and the aid of a real field Thrace basin. Following the period changes, the history matching data is validated to identify potential predictions of the performance for the same reservoir deliverability, so to obtain the preferred production practices, we compare and validate the predicted results with the measured field data. Also, the results show that there is a 45% production rate reduction which is affected by the skin factor. When the reservoir pressure is reduced, the production rate will decrease around 70%. When manipulating the wellhead pressure, there is a slight decrease in production rate compared to tubing size, which does not indicate any major change.

There are several techniques for deliquification of wells, here we used artificial lift methods which are ESP and PSP in a well in Thrace basin suffering from condensate banking.

The gas rate was initially 0.518 mmscf/d

When using ESP gas rate increased to reach 2.3mmscf/d

When using PSP gas rate increased to reach 6.737 mmscf/d

OPTIMUM ARTIFICIAL LIFT SELECTION FOR CONDENSATE GAS WELL
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Petroleum Engineering
  • Project ID: PEE0046
  • Access Fee: ₦5,000 ($14)
  • Pages: 26 Pages
  • Format: Microsoft Word
  • Views: 382
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Petroleum Engineering
    Project ID PEE0046
    Fee ₦5,000 ($14)
    No of Pages 26 Pages
    Format Microsoft Word

    Related Works

    CHAPTER 1 INTRODUCTION 1.0 Background of Study Oil and Gas is considered to be one of the major sources of energy in the world due to its high energy density, easy transportability, and relative abundance. It is a vital factor in every country’s economy. Almost all items that we buy, use, and consume are products of oil. The EIA (Energy... Continue Reading
    ABSTRACT Solution gas drive reservoirs are characterized by rapid and continuous decline of reservoir pressure. This rapid and continuous decline of reservoir pressure causes direct decline of reservoir performance at early stages of the life of the reservoir. The principal source of energy which is gas liberation from the crude oil and the... Continue Reading
    Abstract Solution gas drive reservoirs are characterized by rapid and continuous decline of reservoir pressure. This rapid and continuous decline of reservoir pressure causes direct decline of reservoir performance at early stages of the life of the reservoir. The principal source of energy which is gas liberation from the crude oil and the... Continue Reading
    Introduction Hydrocarbons(oil and gas) are found in the pore spaces of sedimentary geologic formations (reservoir rocks).  Once an oil or gas reservoir is discovered and assessed, production engineers begin the task of maximizing the amount of oil or gas that can ultimately be recovered from it. Some reservoir rocks may allow the oil and gas to... Continue Reading
    ABSTRACT Relevant literature for the modeling and analysis of failure of GRP composites were reviewed. Samples of GRP composites were prepared by hand-lay up. Composites samples were subjected to compressive tests using a tensometer. Mechanical characteristics, such as modulus of elasticity; compressive strength, proportionality limit, elastic... Continue Reading
    ABSTRACT The Project work presents an Optimum design of welded plate girder. A simply supported plate girder with span of 15meters was chosen for the case study. The girder was subjected to a self-weight of 50KN/m and concentrated loads of 1000KN at 5m and 10m from the left support. The plate girder was analysed to get the design moments and shear... Continue Reading
    ABSTRACT The Project work presents an Optimum design of welded plate girder. A simply supported plate girder with span of 15meters was chosen for the case study. The girder was subjected to a self-weight of 50KN/m and concentrated loads of 1000KN at 5m and 10m from the left support. The plate girder was analysed to get the design moments and shear... Continue Reading
    ABSTRACT Electricity companies typically possess numerous units and they need to commit unit because electricity cannot be stored in a large-scale system and demand is a random variable process fluctuating with the time of the day and the day of the week. A problem that must be frequently resolved by electricity utility is to economically... Continue Reading
    ABSTRACT Electricity companies typically possess numerous units and they need to commit unit because electricity cannot be stored in a large-scale system and demand is a random variable process fluctuating with the time of the day and the day of the week. A problem that must be frequently resolved by electricity utility is to economically... Continue Reading
    (A CASE STUDY OF UNITED BANK FOR AFRICA KADUNA) TABLE OF CONTENT Title page    -        -        -        -        -        -        -        -        -        i... Continue Reading
    Call Us
    whatsappWhatsApp Us