DESIGN AND CONSTRUCTION OF AUTOMATIC CHANGE OVER SWITCH WITH INDICATOR

  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0082
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 65 Pages
  • Format: Microsoft Word
  • Views: 1.7K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

This project work deals on the design and construction of an automatic power changeover that will change/transfer control from MAINS to Gen set and can switch ON/OFF the Gen automatically. The system integrates phase selector in MAINS and changeover to Gen. It is designed in several blocks all combined to from one functional unit. A +5v regulated DC power supply unit forms the first block whose output is fed to priority encoder and decoder block. The output of the BCD – Decimal decoder is used to select the phase in priority through a transistor driver stage and electromagnetic relay that activates contactors. The least prioritized phase is the Gen set which contains a circuitry that automatically starts and stops the Gen set. The system is realized with TTL chips market. LEDs and AC panel lamps are used to indicate the status of the system while a manual switch is used to demonstrate the mode of operation of the system.

CHAPTER ONE

INTRODUCTION

Industrial automation and control has contributed immensely to the high rate of the world’s technological growth. Power control and automation is a part of this field which is applied in virtually anywhere electrical power is used, generated or transmitted. Manual power change-over switches have been in existence and in different forms and shapes. 1959, the advent of microelectronics has paved way to modify the manually operated change-over switches. This project deals with the design and construction of automatic change-over switch with indicator. It eliminates the time and energy spent in operating the manual change – over and starting of Gen. Set. It is fully automated. It can be used in residential houses, offices and most importantly, in factories that required constant power supply. It has so many advantages over the existing ones/types.

1.1.  BACKGROUND OF THE STUDY

This project work is embarked upon to eliminate nearly every shortcomings associated with the manually operated type to ensuring that it is fully automated.

This system is realized in several functional blocks all combined to form one functional system. The first block is a 3-phase MAINS regulated dc power supply unit that powers the overall circuit and acts as the input. The output of thin block is fed into a priority encoder (74147) which selects the most prioritized phase at a time. The third block is a BCD – to – DECIMAL Decoder (7442) used to decode the prioritized phase.

The fourth is the driver stage which comprises of NPN transistor that energizes the electromagnetic relay which switches the phase in priority. The Gen set switching section is achieved using the least prioritized phase. This section switches ON the Gen set when all the NEPA phases are low, OFF or faulty. Once the Gen set phase is selected, a switching transistor fires an SCR which conducts large battering current to the ignition coil of the Gen set. Panel indicators are used to show the status of the system.

1.2. OBJECTIVES OF THE PROJECT

The major objectives of this project is to design and construct an automatic change-over switch with Gen set switching facility capable of transferring control from MAINS to Gen set.

It is also aimed at equipping the graduating student with Hands – on experiences which is invaluable in their professional practice. It is aimed at grounding the graduate of EEE in electronic system designs involving power control and automation using random/Hard wired logic. Another objective of this project is to acquaint the graduating students on the ethics of Engineering, technical and scientific writing which is a nucleus of engineering professional practice.

1.3.  SIGNIFICANCE OF THE PROJECT

This project work signifies a lot in Electrical power control and automation. It means a lot in EEE. This project is a design that has to be developed and funded for commercial purposes regarding its usefulness. This project eliminates the stress, time delay and other drawbacks in manually operated types. The project can be modified to display the phase in use at a particular time using a single seven segment Display and its appropriate circuitry. It also exposes the students to digital system designs involving Encoders & Decoders.

1.4.  SCOPE OF THE STUDY

This project work focuses on the design and construction of automatic change-over switch with Gen set switching facility. It covers the following; Encoders and Decoders, Relays/Contactors, 3 – phase regulated DC power supply unit, passive and active components, Generator switching mechanism and it x-rays the mode of calculation of the basic circuit parameter used in the design.

 1.5.  PROJECT REPORT ORGANIZATION

This project report is presented in six chapters to appropriately illustrate the steps involved in its implementation.

Chapter One introduces the project overview, objectives and its significance. Chapter Two is basically the literature review and some theories relevant to the design. Chapter Three x–rays the methodology and analysis while Chapter Four covers the system design and description. Chapter Five elaborates on the implementation, testing and result. Finally, Chapter Six is about the summary of the entire theories and recommendation.

DESIGN AND CONSTRUCTION OF AUTOMATIC CHANGE OVER SWITCH WITH INDICATOR
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0082
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 65 Pages
  • Format: Microsoft Word
  • Views: 1.7K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Electrical Engineering
    Project ID ELE0082
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 65 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT This project work deals on the design and construction of an automatic power changeover that will change/transfer control from MAINS to Gen set and can switch ON/OFF the Gen automatically. The system integrates phase selector in MAINS and changeover to Gen. It is designed in several blocks all combined to from one functional unit. A +5v... Continue Reading
    DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGE OVER SWITCH WITH GENERATOR CUT OFF AND STARTER ABSTRACT Power supply in Nigeria and most developing countries of the world is anything but stable. This has adverse effects on the consumers of the electricity and the equipments that are operated from the mains sources of electricity supply in these... Continue Reading
    ABSTRACT The design and construction of a 60A, 3-Ф automatic power changeover from public utility supply to generator and vice versa was aimed at providing a useful system for use in our homes or offices. The system was achieved with a 66A 3-Ф contactor, 100mA transformers and relays. The system turns on a generator when the public utility... Continue Reading
    ABSTRACT The design and construction of a 60A, 3-Ф automatic power changeover from public utility supply to generator and vice versa was aimed at providing a useful system for use in our homes or offices. The system was achieved with a 66A 3-Ф contactor, 100mA transformers and relays. The system turns on a generator when the public utility... Continue Reading
    ABSTRACT As the zeal for change over on public power supply and stand- by generator increases; Engineers have researched deeply into the different ways and methods of achieving power changeover both manual and automatic types. It may no be considered as serious issue in some places where supply is up to 90% constant or where intermittent outage... Continue Reading
    ABSTRACT As the zeal for change over on public power supply and stand- by generator increases; Engineers have researched deeply into the different ways and methods of achieving power changeover both manual and automatic types. It may no be considered as serious issue in some places where supply is up to 90% constant or where intermittent outage... Continue Reading
    mso-fareast-font-family:'Times New Roman''>ABSTRACT 'Times New Roman''> mso-fareast-font-family:'Times New Roman''>The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the... Continue Reading
    This work is based on automatic changeover switch. If there is failure in main power supply it will automatically change to auxiliary power supply such as generator. This project is based on electromechanical changeover with the use of magnetic contractors, relay,and circuit breaker.... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    Call Us
    whatsappWhatsApp Us