DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGE-OVER SWITCH WITH GENERATOR CUT OFF AND STARTER

  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0069
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 65 Pages
  • Methodology: Scientific
  • Reference: YES
  • Format: Microsoft Word
  • Views: 1.7K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGE OVER SWITCH WITH GENERATOR CUT OFF AND STARTER
ABSTRACT

Power supply in Nigeria and most developing countries of the world is anything but stable. This has adverse effects on the consumers of the electricity and the equipments that are operated from the mains sources of electricity supply in these parts of the world. Automatic change over switch system is used to ensure continuous supply to load in case the mains supply is not healthy or disconnected. This project designs and constructs of an automatic change over switch with generator starter and cut-off. In this paper, we provide an automatic switching mechanism that transfers the consumer loads to a power source from a generator in the case of power failure in the main supply. It automatically detects when power has been restored to the mains supply and returns the loads to this source while turning off the power from the generator set. This mechanism has been tested and we recorded a great result. It thus holds an important key in the provision of a continuous power supply through an ear seamless switching between the mains supply and an alternative stand by source like the generator set.
CHAPTER ONE
INTRODUCTION
1.1 Background of the Study
Public power supply is a major contributor to economic development in every nation. In developing nations like Nigeria, Ghana, Cote d’Ivoire and under developed parts of the world, the public power supply for industrial, commercial and domestic use is highly unstable (Peter, 2002). This has negative effect on the economy in such that most of them had to depend on frequent use of alternative power sources such as generator, inverter, solar to meet up with the energy demands. One of the common alternate sources depended on is the use of generator set which is usually connected to a changeover switch and the public power supply also connected to the switch also. The application of alternative sources of power supply is being faced with the challenge of switching smoothly and timely between the mains supply and the generator supply whenever there is power failure on the mains source and vice versa. (Ransorne, 2009).
Automatic Changeover switch with generator cut off and starter is one of the electrical devices that can aid smooth switching from public supply to generator and vice versa. It automatically switches from one power source to another. When there is power failure in the public supply it starts the generator and switches to the supply (generator) and it equally switches over to the mains supply when power is restored and turns off the generator automatically. The automatic power changeover switchwith generator cut off and starter is a device that links the load and mains supply or the alternative supply together. This enables the use of either the mains supply or an alternative source when there is outage on the mains source without the user intervention. The changeover switch can either come in with three phase or single phase. This device maintains constant power supply to the load by automatically activating the generator when there is need. Since the user might not always be in need of the generator, provision has been made to prevent the generator from starting should an outage occur. Therefore, in view of these considerations, the project aimed at designing and constructing a workable automatic change-over switch with generator cut off and starter functions.
1.2 STATEMENT OF THE PROBLEM
The frequent of power outages in developing countries like the case of Nigeria creates a need for automation of electrical power generation or alternative sources of power to back up the utility supply. This automation becomes important since the rate of power outage becomes predominantly high. Most industries and commercial processes are partly dependent on generators and public power supply which is epileptic especially in Nigeria. Therefore, if the processes of power change-over between these two power supplying sources are manual, human error during change-over leading to machine damage, electric shock/electrocution as well as increased down time consequently introducing massive losses. However, if the starting of the generator is automatically done by a relay which switches the battery voltage to ignition coil of the generator while the main power relay switches the load to either public supply or generator, the down time would greatly be reduce thereby maintaining the tempo of production. In view of the background, this project tends to focus on the design and construction of an automatic changeover switch with generator cut off and starter.
1.3 AIM AND OBJECTIVES
    This project is centered on design and construction of an automatic change-over switch with generator cut off and starter. However, the specific objectives are as follow;
1.    To design a device that automatically switches on the generator and switch over the load to the generator whenever there is mains power failure.
2.    To sort and examine various components to be used for the construction of automatic changeover switch
3.    To design and integrate the sub-units of the automatic changeover switch
4.    To carryout a test on the sub-units design of the automatic changeover switch
1.4 SCOPE OF THE STUDY
The scope of this project is focus on designing and construction of a change-over switch with cut off and starter of a generator with the capacity of 3.5KVA.It also revolves around a project that is designed for power supply applications. It involves automatic changeover between the main power supply and an auxiliary power supply, such as a generator. The project implements an automatic switching or starting of the power generator whenever the main power fails.
1.5 LIMITATION OF THE STUDY
    Some of the limitations of the automatic changeover design are;
1.    The design cannot function with a generator that is not auto-start.
2.    It does not function properly for a generator higher than 3KVA.
3.    The design of the automatic changeover switch with cut off and starter does not function with a faulty generating set
4.    The design will not function properly when there is no enginestopper in the generator.
1.6    SIGNIFICANCE OF THE STUDY
The significance of this work cannot be overemphasized. Therefore, benefits that are associated to the change-over switch are;
1.    It minimizes damages to lives and equipment since it has its own monitoring system and its switching requires no human contact with the switch, thus eliminating human error.
2.    It reduces change-over time to a minimum, due to its fast response to power restoration
3.    It maintains high quality of service through its fast and prompt response.
4.    Moreover, the unit is portable, easy, convenient and safe to install.

DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGE-OVER SWITCH WITH GENERATOR CUT OFF AND STARTER
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0069
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 65 Pages
  • Methodology: Scientific
  • Reference: YES
  • Format: Microsoft Word
  • Views: 1.7K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Electrical Engineering
    Project ID ELE0069
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 65 Pages
    Methodology Scientific
    Reference YES
    Format Microsoft Word

    Related Works

    DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGE OVER SWITCH WITH GENERATOR CUT OFF AND STARTER ABSTRACT Power supply in Nigeria and most developing countries of the world is anything but stable. This has adverse effects on the consumers of the electricity and the equipments that are operated from the mains sources of electricity supply in these... Continue Reading
    DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGE OVER SWITCH WITH GENERATOR CUT OFF AND STARTER ABSTRACT Power supply in Nigeria and most developing countries of the world is anything but stable. This has adverse effects on the consumers of the electricity and the equipments that are operated from the mains sources of electricity supply in these... Continue Reading
    ABSTRACT Most industrial and commercial processes are dependent on electrical power. Power failure or outage in general does not promote development in public and private sectors. The investors do not feel secure to come into a country with constant or frequent power failure. This limits the development of industries.In addition there are... Continue Reading
    ABSTRACT Most industrial and commercial processes are dependent on electrical power. Power failure or outage in general does not promote development in public and private sectors. The investors do not feel secure to come into a country with constant or frequent power failure. This limits the development of industries.In addition there are... Continue Reading
    ABSTRACT This project work deals on the design and construction of an automatic power changeover that will change/transfer control from MAINS to Gen set and can switch ON/OFF the Gen automatically. The system integrates phase selector in MAINS and changeover to Gen. It is designed in several blocks all combined to from one functional unit. A +5v... Continue Reading
    CHAPTER ONE INTRODUCTION The evolutionary trend in industrial electronics and automation has engulfed all parts of the world and proved more challenging to as third world like Nigeria. Regarding the milestone, it was decided to make the choice of project research on the design and implementation of an automatic 3 - phase change – over with... Continue Reading
    ABSTRACT The design and construction of a 60A, 3-Ф automatic power changeover from public utility supply to generator and vice versa was aimed at providing a useful system for use in our homes or offices. The system was achieved with a 66A 3-Ф contactor, 100mA transformers and relays. The system turns on a generator when the public utility... Continue Reading
    ABSTRACT The design and construction of a 60A, 3-Ф automatic power changeover from public utility supply to generator and vice versa was aimed at providing a useful system for use in our homes or offices. The system was achieved with a 66A 3-Ф contactor, 100mA transformers and relays. The system turns on a generator when the public utility... Continue Reading
    ABSTRACT As technological advancement has been on the increase in our society many have fallen in love with technology and world want to have a feel in virtually to every thing they do. A design has been made in combination of electrical and electronics to change over from one power sources to the other automatically and trip off generation after... Continue Reading
    ABSTRACT  As technological advancement has been on the increase in our society many have fallen in love with technology and world want to have a feel in virtually  to every thing they do. A design has been made in combination of electrical and electronics to change over from one power sources to the other automatically and trip off generation... Continue Reading
    Call Us
    whatsappWhatsApp Us