SINGLE PHASE AUTOMATIC CHANGEOVER

  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0437
  • Access Fee: ₦5,000 ($14)
  • Pages: 32 Pages
  • Format: Microsoft Word
  • Views: 421
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT
The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. 
Power instability or outage in general does not promote development in the public and private sector. The investors do not feel secure to come into a country with constant or frequent power failure. These limit the development of industries. In addition, there are processes that cannot be interrupted because of their importance for instance, surgery operation in hospitals, transfer of money between banks and lots more. Power instability and outage in developing countries (Nigeria) creates a need for alternative sources of power to backup the mains supply.
Automatic changeover switches find a wide application scope wherever the reliability of electrical supply from the utilities is low and it is used in lighting/motor circuits wherever continuity of supply is necessary, for switching to an alternative source from main supply and vice versa.
This project is a design of an automatic changeover switch. This means that when there is any mains failure, the automatic changeover switch will change to an alternative power supply (Generator), and back to the main supply when it is restored. The purpose of this project is to maintain constant supply to the main circuit that is being supplied by making-up for the time lapse or delay that usually accompanies the manual switching from one source to another.
The design comprises of the power connection circuit and control connection circuit. The main components to be used include; contactors, relays and timer.

TABLE OF CONTENTS
Title pagei
Certificationiii
Dedicationiv
Acknowledgementv
Table of contentvi
Abstractxi
CHAPTER ONE
INTRODUCTION
1.0     Introduction
11.     PROJECT AIMS AND OBJECTIVES
1.2TARGET BENEFICIARIES

CHAPTER TWO
2.1 LITERATURE REVIEW

CHAPTER THREE
3.1    PROBLEM STATEMENT/DESIGN PROBLEM
3.1.1    THE POWER SECTION
3.1.2    THE CONTROL SECTION
3.2   RELEVANCE OF THE PROJECT
3.3METHOD OF SOUTION/ DESIGN PROCEDURE
3.3.1WORKING OF THE CHANGEOVER
3.3.2REALIZATION OF POWER SECTION
3.3.2.1OPERATION OF THE POWER CIRCUIT
3.3.3REALIZATION OF THE CONTROL 
3.3.3.1OPERATION OF THE CONTROL CIRCUIT
3.3.4Timing circuit
3.4THEORY OF DEVICES

 CHAPTER FOUR
 COMPONENTS SELECTION AND COMPUTATIONAL RESULTS
4.1 SELECTION OF COMPONENTS
4.2    OBSERVATION
4.3 RESULTS
4.4 DISCUSSION OF RESULTS OBTAINED

CHAPTER FIVE
5.0 SUMMARY OF FINDING, CONCLUSION AND RECOMMENDATION, 
5.1    Recommendation
5.2    Conclusion

REFERENCE
SINGLE PHASE AUTOMATIC CHANGEOVER
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0437
  • Access Fee: ₦5,000 ($14)
  • Pages: 32 Pages
  • Format: Microsoft Word
  • Views: 421
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Electrical Engineering
    Project ID ELE0437
    Fee ₦5,000 ($14)
    No of Pages 32 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    ABSTRACT Most industrial and commercial processes are dependent on electrical power. Power failure or outage in general does not promote development in public and private sectors. The investors do not feel secure to come into a country with constant or frequent power failure. This limits the development of industries.In addition there are... Continue Reading
    ABSTRACT Most industrial and commercial processes are dependent on electrical power. Power failure or outage in general does not promote development in public and private sectors. The investors do not feel secure to come into a country with constant or frequent power failure. This limits the development of industries.In addition there are... Continue Reading
    CHAPTER ONE 1.0             INTRODUCTION As the quest for change over on public power supply and stand by generation increase. Engineering have researches deep into the different methods of achieving to both manual and automatic types.           It may not be taken seriously in some places where power supply is up to 90... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    This work is based on automatic changeover switch. If there is failure in main power supply it will automatically change to auxiliary power supply such as generator. This project is based on electromechanical changeover with the use of magnetic contractors, relay,and circuit breaker. ... Continue Reading
    mso-fareast-font-family:'Times New Roman''>ABSTRACT 'Times New Roman''> mso-fareast-font-family:'Times New Roman''>The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the... Continue Reading
    This work is based on automatic changeover switch. If there is failure in main power supply it will automatically change to auxiliary power supply such as generator. This project is based on electromechanical changeover with the use of magnetic contractors, relay,and circuit breaker.... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    Call Us
    whatsappWhatsApp Us