DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGEOVER SWITCH

  • Type: Project
  • Department: Science Education
  • Project ID: 0005
  • Access Fee: ₦5,000 ($14)
  • Pages: 73 Pages
  • Format: Microsoft Word
  • Views: 414
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853






mso-fareast-font-family:"Times New Roman"">ABSTRACT

"Times New Roman"">






mso-fareast-font-family:"Times New Roman"">The main aim of any electric power

supply in the world is to provide uninterrupted power supply at all times to

all its consumers. Although, in developing countries, the electric power

generated to meet the demands of the growing consumers of electricity is

insufficient, hence power instability and outage.






mso-fareast-font-family:"Times New Roman"">Power instability or outage in

general does not promote development in the public and private sector. The

investors do not feel secure to come into a country with constant or frequent

power failure. These limit the development of industries. In addition, there

are processes that cannot be interrupted because of their importance for

instance, surgery operation in hospitals, transfer of money between banks and

lots more.Power instability and outage in developing countries (Nigeria)

creates a need for alternative sources of power to backup the mains supply.






mso-fareast-font-family:"Times New Roman"">Automatic changeover switches find a

wide application scope wherever the reliability of electrical supply from the

utilities is low and it is used in lighting/motor circuits wherever continuity

of supply is necessary, for switching to an alternative source from main supply

and vice versa.






mso-fareast-font-family:"Times New Roman"">This project is a design of an

automatic changeover switch. This means that when there is any mains failure,

the automatic changeover switch will change to an alternative power supply

(Generator), and back to the main supply when it is restored.






mso-fareast-font-family:"Times New Roman"">The purpose of this project is to

maintain constant supply to the main circuit that is being supplied by

making-up for the time lapse or delay that usually accompanies the manual

switching from one source to another.






mso-fareast-font-family:"Times New Roman"">The design comprises of the power

connection circuit and control connection circuit. The main components to be

used include; contactors, relays and timer.



mso-fareast-font-family:"Times New Roman"">


DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGEOVER SWITCH
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Science Education
  • Project ID: 0005
  • Access Fee: ₦5,000 ($14)
  • Pages: 73 Pages
  • Format: Microsoft Word
  • Views: 414
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Science Education
    Project ID 0005
    Fee ₦5,000 ($14)
    No of Pages 73 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT This project work deals on the design and construction of an automatic power changeover that will change/transfer control from MAINS to Gen set and can switch ON/OFF the Gen automatically. The system integrates phase selector in MAINS and changeover to Gen. It is designed in several blocks all combined to from one functional unit. A +5v... Continue Reading
    Abstract Power failure or outage in general does not promote development to public and private sector. The investors do not feel secure to come into a country with constant or frequent power failure. These limit the development of industries. In addition there are processes that cannot be interrupted because of their importance, for instance... Continue Reading
    Abstract Power failure or outage in general does not promote development to public and private sector. The investors do not feel secure to come into a country with constant or frequent power failure. These limit the development of industries. In addition there are processes that cannot be interrupted because of their importance, for instance... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    ABSTRACT Most industrial and commercial processes are dependent on electrical power. Power failure or outage in general does not promote development in public and private sectors. The investors do not feel secure to come into a country with constant or frequent power failure. This limits the development of industries.In addition there are... Continue Reading
    ABSTRACT Most industrial and commercial processes are dependent on electrical power. Power failure or outage in general does not promote development in public and private sectors. The investors do not feel secure to come into a country with constant or frequent power failure. This limits the development of industries.In addition there are... Continue Reading
    ABSTRACT This project work deals on the design and construction of an automatic power changeover that will change/transfer control from MAINS to Gen set and can switch ON/OFF the Gen automatically. The system integrates phase selector in MAINS and changeover to Gen. It is designed in several blocks all combined to from one functional unit. A +5v... Continue Reading
    ABSTRACT The design and construction of a 60A, 3-Ф automatic power changeover from public utility supply to generator and vice versa was aimed at providing a useful system for use in our homes or offices. The system was achieved with a 66A 3-Ф contactor, 100mA transformers and relays. The system turns on a generator when the public utility... Continue Reading
    DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGE OVER SWITCH WITH GENERATOR CUT OFF AND STARTER ABSTRACT Power supply in Nigeria and most developing countries of the world is anything but stable. This has adverse effects on the consumers of the electricity and the equipments that are operated from the mains sources of electricity supply in these... Continue Reading
    ABSTRACT The design and construction of a 60A, 3-Ф automatic power changeover from public utility supply to generator and vice versa was aimed at providing a useful system for use in our homes or offices. The system was achieved with a 66A 3-Ф contactor, 100mA transformers and relays. The system turns on a generator when the public utility... Continue Reading
    Call Us
    whatsappWhatsApp Us