AN INVESTIGATION INTO THE PROBLEMS FACED IN CONSTRUCTION PROJECT COMPLETION: CASE OF DEPARTMENT OF PUBLIC WORKS MIDLANDS PROVINCE

  • Type: Project
  • Department: Public Health
  • Project ID: PUH0124
  • Access Fee: ₦5,000 ($14)
  • Pages: 68 Pages
  • Format: Microsoft Word
  • Views: 418
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT 

Delay is one of the major problems in Zimbabwe construction industry. Delays lead to many negative effects such as disputes between clients and contractors, increased cost, loss of productivity and revenue and termination of contract. The aim of this research was to investigate the challenges faced in construction project completions and find ways to minimize the project delays. A case study method was adopted for this research through primary data and secondary data. The data collected was analyzed using the relative importance index to determine the most causes and effects of construction delays in construction projects. However the results obtained from the ratings show that change in drawings, lack of effective communication and lack of finance rank high on the causes of delay. Reduced profit, wastages and underutilization of manpower and resources ranked high on the effects of delays. The researcher concluded that delays causes more harm than good in construction project. Therefore action should be taken to avoid such factors of delay in construction project in order to improve the efficiency and effectiveness of the industry 

AN INVESTIGATION INTO THE PROBLEMS FACED IN CONSTRUCTION PROJECT COMPLETION: CASE OF DEPARTMENT OF PUBLIC WORKS MIDLANDS PROVINCE
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Public Health
  • Project ID: PUH0124
  • Access Fee: ₦5,000 ($14)
  • Pages: 68 Pages
  • Format: Microsoft Word
  • Views: 418
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Public Health
    Project ID PUH0124
    Fee ₦5,000 ($14)
    No of Pages 68 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT  Delay is one of the major problems in Zimbabwe construction industry. Delays lead to many negative effects such as disputes between clients and contractors, increased cost, loss of productivity and revenue and termination of contract. The aim of this research was to investigate the challenges faced in construction project completions... Continue Reading
    ABSTRACT Projects are undertaken with the end goal of getting completed someday. Project completion is a collective responsibility among the parties involved. The dilemma and struggle for project completion is a concern in the 21st century. The study intended to find out possible effect of scope changes on project completion among road... Continue Reading
    Projects are undertaken with the end goal of getting completed someday. Project completion is a collective responsibility among the parties involved. The dilemma and struggle for project completion is a concern in the 21st century. The study intended to find out possible effect of scope changes on project completion among road construction... Continue Reading
    ABSTRACT The aim of this study was to determine suitable sites for locating a landfill in Gweru city. The study also sought to analyze the social impacts of the current disposal site to the local residents. Interviews with the City of Gweru and EMA were used to get the results on the social impacts of the current disposal site. Questionnaires and... Continue Reading
    ABSTRACT The purpose of this study was to find out if visually impaired students at Midlands State University are facing similar challenges as students in Namibia at Secondary schools in their learning environments. The researcher intended to find solutions to the problems that are faced by the visually impaired students at Midlands State... Continue Reading
    ABSTRACT The purpose of this study was to evaluate the effectiveness of electronic media in teaching and learning. The study was carried out in Gokwe South District in Midlands Province. The population of this study consisted of two secondary schools in Gokwe South District. These two secondary school were chosen through purposive sampling... Continue Reading
    CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY When asked to define 'design error,' not all disciplines in the construction process agree on a common definition. Depending on which discipline you address, the owner, the designer or the contractor there will be a common understanding... Continue Reading
    ABSTRACT A research into the spiral growth of banks in Nigeria: manpower problems and solutions cannot be over-emphasized.  In pursuance of this investigation, the researcher formulated four research objectives.  Utilized library and sample survey techniques. Data were gathered through primary and secondary sources.  The data gathered were then... Continue Reading
    Over the years, countries of the world have defined and set the standards of financial reporting in their individual territories. However, globalization has brought about ever increasing collaboration, international trade and commerce among the countries of the world; hence, there is grave need for increased uniformity in the standards guiding... Continue Reading
    . (CASE STUDY OF KWARA STATE MINISTRY OF FINANCE, AGENCIES AND CORPORATION) CHAPTER ONE INTRODUCTION 1.1.           BACKGROUND TO THE STUDY Over the years, countries of the world have... Continue Reading
    Call Us
    whatsappWhatsApp Us