CONSTRUCTION OF AUTOMATIC CHANGE OVER WITH GENERATOR TRIP OFF

  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0145
  • Access Fee: ₦5,000 ($14)
  • Pages: 34 Pages
  • Format: Microsoft Word
  • Views: 1.2K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT 
As technological advancement has been on the increase in our society many have fallen in love with technology and world want to have a feel in virtually  to every thing they do.
A design has been made in combination of electrical and electronics to change over from one power sources to the other automatically and trip off generation after 40 seconds without going through the point for manual operation. This project writing were organized in according way for easy understanding  
 
TABLE OF CONTENT
Title page
Approval page
Acknowledgement
Abstract
Table of content 
Table of figure 

CHAPTER ONE  
1.0Introduction
1.1Design objectives 
1.2Significance of the project 
1.3 The project report  models relevant to the design  

CHAPTER TWO    
2.0Literature review 
2.1System component analysis
2.2Theories and models relevant to the design 

CHAPTER THREE    
3.0System design 
3.1Description of the system building blocks 
3.2System specification and block diagram
3.3Description of overall operation of the system 
3.4Complete circuit diagram of the system 

CHAPTER FOUR  
4.0Implementation testing and results 
4.1Packaging of the system 

CHAPTER FIVE  
5.0Cost analysis 
5.1Conclusions and recommendation/suggestion
For Further Implementation
References 

CONSTRUCTION OF AUTOMATIC CHANGE OVER WITH GENERATOR TRIP OFF
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0145
  • Access Fee: ₦5,000 ($14)
  • Pages: 34 Pages
  • Format: Microsoft Word
  • Views: 1.2K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Electrical Engineering
    Project ID ELE0145
    Fee ₦5,000 ($14)
    No of Pages 34 Pages
    Format Microsoft Word

    Related Works

    DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGE OVER SWITCH WITH GENERATOR CUT OFF AND STARTER ABSTRACT Power supply in Nigeria and most developing countries of the world is anything but stable. This has adverse effects on the consumers of the electricity and the equipments that are operated from the mains sources of electricity supply in these... Continue Reading
    CHAPTER ONE INTRODUCTION The evolutionary trend in industrial electronics and automation has engulfed all parts of the world and proved more challenging to as third world like Nigeria. Regarding the milestone, it was decided to make the choice of project research on the design and implementation of an automatic 3 - phase change – over with... Continue Reading
    DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGE OVER SWITCH WITH GENERATOR CUT OFF AND STARTER ABSTRACT Power supply in Nigeria and most developing countries of the world is anything but stable. This has adverse effects on the consumers of the electricity and the equipments that are operated from the mains sources of electricity supply in these... Continue Reading
    ABSTRACT Most industrial and commercial processes are dependent on electrical power. Power failure or outage in general does not promote development in public and private sectors. The investors do not feel secure to come into a country with constant or frequent power failure. This limits the development of industries.In addition there are... Continue Reading
    ABSTRACT Most industrial and commercial processes are dependent on electrical power. Power failure or outage in general does not promote development in public and private sectors. The investors do not feel secure to come into a country with constant or frequent power failure. This limits the development of industries.In addition there are... Continue Reading
    ABSTRACT As the zeal for change over on public power supply and stand- by generator increases; Engineers have researched deeply into the different ways and methods of achieving power changeover both manual and automatic types. It may no be considered as serious issue in some places where supply is up to 90% constant or where intermittent outage... Continue Reading
    ABSTRACT As the zeal for change over on public power supply and stand- by generator increases; Engineers have researched deeply into the different ways and methods of achieving power changeover both manual and automatic types. It may no be considered as serious issue in some places where supply is up to 90% constant or where intermittent outage... Continue Reading
    ABSTRACT          The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient hence instability and outage.  Power instability or... Continue Reading
    ABSTRACT This project work deals on the design and construction of an automatic power changeover that will change/transfer control from MAINS to Gen set and can switch ON/OFF the Gen automatically. The system integrates phase selector in MAINS and changeover to Gen. It is designed in several blocks all combined to from one functional unit. A +5v... Continue Reading
    CHAPTER ONE 1.0             INTRODUCTION As the quest for change over on public power supply and stand by generation increase. Engineering have researches deep into the different methods of achieving to both manual and automatic types.           It may not be taken seriously in some places where power supply is up to 90... Continue Reading
    Call Us
    whatsappWhatsApp Us