ABSTRACT

         The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient hence instability and outage. Power instability or outage in general does not promote development in the public and private sector. The inventors do not feel secure to come into a country with constant or frequent power failure. These limit the development of industries. In addition, there are processes that cannot be interrupted because of their importance. For instance, surgery operation in hospitals, transfer of money between bank and lots more. Power instability and outage in developing countries (Nigeria) creates a need for alternative source of power to backup the main supply. Automatic changeover switches find a wide application scope wherever the reliability of electric supply from the utilities is low and it is used in lighting motor circuits wherever continuity of supply is necessary. For switching to an alternative source from main supply and vice versa.

         This project is a design of an automatic changeover switch this means that when there is any mains failure, the automatic changeover switch will change to an alternative power supply (GENERATOR) and back to the main supply when it is restored.

         The purpose of this project is to maintain constant supply to the main circuit that is being supplied by making up for the time delay that usually accompanies the manual switching from one source to another.

         The design comprises of the power connection circuit and control connection circuit. The main components to be used include contactor, relay, timers, rectifier e.t.c.


 

TABLE OF CONTENTS

 Title Page                                                                               i

Certification                                                                             ii

Acknowledgements                                                                  iii

Abstract                                                                                  iv

Table of Contents                                                                    v

 

CHAPTER ONE

1.1    Introduction                                                                    1

1.2    Aim and Objective of the Project                                      3

1.3    Scope of the Project                                                        3

CHAPTER TWO

2.1    Literature Review                                                             5

2.2    Manual Change-over Switch                                             5

2.3    Automatic Change-over Switch                                         6

2.4    Related Work                                                                  10

2.5    Reasons for Automatic Change-over Switch                      16

2.6    Problems of Automatic Change-over Switch                      17

 

CHAPTER THREE

3.1    Methodology (Material and Methods)                                18

3.2    Circuit Conductor                                                            18

3.3    Circuit Breaker                                                                19

3.4    Reset Timer                                                                    20

3.5    Contactor                                                                       21

3.6    Operation of Timer Delay                                                 24

3.7    Principle of Operation                                                      25

CHAPTER FOUR

4.0    Construction                                                                   29

4.1    List of Component Used                                                   29

4.2    Vero Board                                                                     29

4.3    Bread Board                                                                    30

4.4    Soldering Iron                                                                 33

4.5.1 Testing, Maintenance and Discussion                                36

4.5.2 Polarity Test                                                                    36

4.5.3 Insulation Resistance Test between the Live and Neutral Conductors                                                                     37

4.5.4 Earthling Test                                                                 37

4.6    Maintenance of Contactor and Installation                        37        

CHAPTER FIVE

5.1    Conclusion                                                                      39

5.2    Recommendation                                                            39

         References                                                                      40

         Bill of Engineering Measurement and Evaluation (BEME)    41

 

DESIGN AND CONSTRUCTION OF AUTOMATIC CHANGE-OVER FOR THREE PHASES
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0522
  • Access Fee: ₦5,000 ($14)
  • Pages: 55 Pages
  • Format: Microsoft Word
  • Views: 529
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Electrical Engineering
    Project ID ELE0522
    Fee ₦5,000 ($14)
    No of Pages 55 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT          The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient hence instability and outage.  Power instability or... Continue Reading
    ABSTRACT This project work deals on the design and construction of an automatic power changeover that will change/transfer control from MAINS to Gen set and can switch ON/OFF the Gen automatically. The system integrates phase selector in MAINS and changeover to Gen. It is designed in several blocks all combined to from one functional unit. A +5v... Continue Reading
    DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGE OVER SWITCH WITH GENERATOR CUT OFF AND STARTER ABSTRACT Power supply in Nigeria and most developing countries of the world is anything but stable. This has adverse effects on the consumers of the electricity and the equipments that are operated from the mains sources of electricity supply in these... Continue Reading
    ABSTRACT The design and construction of a 60A, 3-Ф automatic power changeover from public utility supply to generator and vice versa was aimed at providing a useful system for use in our homes or offices. The system was achieved with a 66A 3-Ф contactor, 100mA transformers and relays. The system turns on a generator when the public utility... Continue Reading
    CHAPTER ONE 1.0             INTRODUCTION As the quest for change over on public power supply and stand by generation increase. Engineering have researches deep into the different methods of achieving to both manual and automatic types.           It may not be taken seriously in some places where power supply is up to 90... Continue Reading
    ABSTRACT The design and construction of a 60A, 3-Ф automatic power changeover from public utility supply to generator and vice versa was aimed at providing a useful system for use in our homes or offices. The system was achieved with a 66A 3-Ф contactor, 100mA transformers and relays. The system turns on a generator when the public utility... Continue Reading
    CHAPTER ONE INTRODUCTION The evolutionary trend in industrial electronics and automation has engulfed all parts of the world and proved more challenging to as third world like Nigeria. Regarding the milestone, it was decided to make the choice of project research on the design and implementation of an automatic 3 - phase change – over with... Continue Reading
    ABSTRACT As the zeal for change over on public power supply and stand- by generator increases; Engineers have researched deeply into the different ways and methods of achieving power changeover both manual and automatic types. It may no be considered as serious issue in some places where supply is up to 90% constant or where intermittent outage... Continue Reading
    ABSTRACT As the zeal for change over on public power supply and stand- by generator increases; Engineers have researched deeply into the different ways and methods of achieving power changeover both manual and automatic types. It may no be considered as serious issue in some places where supply is up to 90% constant or where intermittent outage... Continue Reading
    ABSTRACT  As technological advancement has been on the increase in our society many have fallen in love with technology and world want to have a feel in virtually  to every thing they do. A design has been made in combination of electrical and electronics to change over from one power sources to the other automatically and trip off generation... Continue Reading
    Call Us
    whatsappWhatsApp Us