CHAPTER ONE

INTRODUCTION

The evolutionary trend in industrial electronics and automation has engulfed all parts of the world and proved more challenging to as third world like Nigeria. Regarding the milestone, it was decided to make the choice of project research on the design and implementation of an automatic 3 - phase change – over with Generator switching which will eliminate the stress and lapses involved in the manual process. This electronics system is realized using 3 – phase regulated Dc power supply unit whose output is compared and fed to a 3 – input AND gate that encodes control logic to the driver stage realized using NPN Bipolar junction transistors which energize three electromagnetic relays. These relays in turn energize single coil three contacts contactors that switch the phases. (Manaha, 2008) A control/switching circuit is also integrated that takes care of the Gen set switching whenever at least one phase from mains is low/faulty.

1.1.                GENERAL DESCRIPTION OF THE PROJECT

The project design and implementation of automatic 3 – phase change – over with Gen set switching is built in several functional blocks all combined to form one functional unit. The first is made up of regulated Dc voltage power supply unit whose output is compared and fed into 74 LS11 that generates the control logic. This logic is used to bias the driver stage which energizes electromagnetic relay. These relays serve as auxiliary to a single coil 3 - contact contactor of suitable rating. The Gen set switching module incorporates delay timer and solid state relay that takes care of the process.

The project, so constructed is packaged in a plastic casing for compatibility. On the surface of the package, there are three 100k vol/pot which are used to demonstrate low voltage in a given phase. Three amber LEDs represents the mains while the three blue LEDs are for the Gen set. And these make up of the panel indicator.

1.2.          OBJECTIVES OF THE PROJECT

One of the objectives of this project is to design and construct an automatic 3 – phase change – over with Gen set switching facility which will automatically switch ON/OFF Gen set and change over between PHCN and Gen set. It is also aimed at exposing the graduating student to electronics system designing using random logic - especially in designing in industries and power electronic. Another objective of this study is to ground the graduating students in Engineering, scientific and technical writing which is indispensable in their professional practice.

1.3.  SIGNIFICANCE OF THE PROJECT

This project work signifies a lot in industrial automation and power electronics. It is very useful in wood processing industries, oil rig equipments and other manufacturing industries that used 3 – phase machines. A project of this nature can be modified to function as automatic phase selector which can be used anywhere.

1.4.  SCOPE OF THE PROJECT

This project work covers the following; transistor drivers, electromagnetic relay, contractors, 3 – input AND gate encoder, shunt regulation and comparator using Zener diode, delay/un-delay timer and other system.

DESIGN AND CONSTRUCTION OF A 3-PHASEA AUTOMATIC POWER CHANGE OVER WITH GENERATOR SET SWITCHING FACILITY
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0075
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 65 Pages
  • Format: Microsoft Word
  • Views: 1.6K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Electrical Engineering
    Project ID ELE0075
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 65 Pages
    Format Microsoft Word

    Related Works

    CHAPTER ONE INTRODUCTION The evolutionary trend in industrial electronics and automation has engulfed all parts of the world and proved more challenging to as third world like Nigeria. Regarding the milestone, it was decided to make the choice of project research on the design and implementation of an automatic 3 - phase change – over with... Continue Reading
    DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGE OVER SWITCH WITH GENERATOR CUT OFF AND STARTER ABSTRACT Power supply in Nigeria and most developing countries of the world is anything but stable. This has adverse effects on the consumers of the electricity and the equipments that are operated from the mains sources of electricity supply in these... Continue Reading
    ABSTRACT  As technological advancement has been on the increase in our society many have fallen in love with technology and world want to have a feel in virtually  to every thing they do. A design has been made in combination of electrical and electronics to change over from one power sources to the other automatically and trip off generation... Continue Reading
    ABSTRACT As technological advancement has been on the increase in our society many have fallen in love with technology and world want to have a feel in virtually to every thing they do. A design has been made in combination of electrical and electronics to change over from one power sources to the other automatically and trip off generation after... Continue Reading
    DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGE OVER SWITCH WITH GENERATOR CUT OFF AND STARTER ABSTRACT Power supply in Nigeria and most developing countries of the world is anything but stable. This has adverse effects on the consumers of the electricity and the equipments that are operated from the mains sources of electricity supply in these... Continue Reading
    ABSTRACT Most industrial and commercial processes are dependent on electrical power. Power failure or outage in general does not promote development in public and private sectors. The investors do not feel secure to come into a country with constant or frequent power failure. This limits the development of industries.In addition there are... Continue Reading
    ABSTRACT Most industrial and commercial processes are dependent on electrical power. Power failure or outage in general does not promote development in public and private sectors. The investors do not feel secure to come into a country with constant or frequent power failure. This limits the development of industries.In addition there are... Continue Reading
    ABSTRACT          The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient hence instability and outage.  Power instability or... Continue Reading
    ABSTRACT This project work deals on the design and construction of an automatic power changeover that will change/transfer control from MAINS to Gen set and can switch ON/OFF the Gen automatically. The system integrates phase selector in MAINS and changeover to Gen. It is designed in several blocks all combined to from one functional unit. A +5v... Continue Reading
    CHAPTER ONE 1.0             INTRODUCTION As the quest for change over on public power supply and stand by generation increase. Engineering have researches deep into the different methods of achieving to both manual and automatic types.           It may not be taken seriously in some places where power supply is up to 90... Continue Reading